To improve your shopping experience today and in the future, this site uses cookies.
I Accept Cookies
Extra Long Lead Rope BLACK single
Extra Long Lead Rope BLACK single
Shires

Extra Long Lead Rope BLACK single

£7.19 £8.00 10% off
Earn
in Customer Rewards when you buy this item today
Pre-Order

With Pre-Order, you can purchase the latest items added to our store in advance of them arriving with us.

Your Pre-Order is prioritised (at no additional charge); meaning that as soon as the product arrives with us, we can wrap it straight back up; ready for collection via Click & Collect or despatch to you — it often never even hits the stock room shelves!

Pre-Launch

With Pre-Launch, the date when we expect to receive the product ourselves is still a little too hazy to be confident in accepting Pre-Orders.

So, instead, you can submit your email address against the item you are interested in and we will email you as soon as stock arrives on the system.

Estimated Delivery & Collection Dates

Estimated Delivery & Collection Dates are given on Pre-Order and Pre-Launch products. They are for indication purposes only and can change at any time without notice.

The dates we provide are based on indications given by our suppliers. Whenever we get updated information from our suppliers we will endeavour to update the Estimated Delivery & Collection Dates provided on product pages.

We estimate this will be ready for despatch to you or collection via Click & Collect on Undetermined
Earn Rewards
When you purchase this item, you will earn of rewards points to spend on your next purchase from us. You can spend your Rewards balance in-store & online.
Hassle free returns.


Returning an Item Purchased Online - please note the exceptions / non-returnable items listed below
To be eligible for a Return, your item must be in the same condition that you received it, unworn or unused, with tags, and in its original packaging. You’ll also need the receipt or proof of purchase (excludes bank statements). This is applicable for returning an item bought both in store or online. All items returned will be checked by our returns department. Any items sent back with a defined, strong odour such as strong cooking smells, cigarette smoke, perfume etc. do not qualify for a store credit, a refund, or exchange.

Damages and issues
Please inspect your order immediately upon receipt and contact us immediately if the item has been damaged in transit, is defective, or if you receive the wrong item. Please take photos and email them to
[email protected] so that we can evaluate the situation and make put matters right for you.

Returning for another reason
Should your item prove to be the wrong size or an unexpected colour, we have a 28-day return policy. Which means you have a 28 day window after receiving your item to complete the Return Form and return the item to us.

Your item must be in the same condition that you received it, unworn or unused, with tags, and in its original packaging. You will also need the receipt or proof of purchase including your Order number handy. If you are posting any item back to us you are responsible for paying the postage unless the item is faulty in which case this cost will be credited. If purchased via the website items need to have been paid for by a UK based provider such as MasterCard, Visa, Maestro, PayPal and Klarna. Some items are non-returnable an these are detailed below.

Included in your parcel is a Returns Form for you complete. Please complete the Returns Form stating the item you wish to return, the Order reference and the reason for return.
Return postage costs are your responsibilty unless the item is faulty. Send the parcel including your item and the Returns Form, back to:
Returns Department, Aivly Country Store Ltd, Crow Lane, Ringwood, Hampshire, BH24 3EA.
Once we have received the item back and inspected it we will notify you of your refund. If approved, you’ll be automatically refunded on your original payment method. Should the item be faulty we will cover the return postage. If the item was ordered in error, or is simply no longer required, you would cover the postage cost of returning the item to Aivly. Please remember it can take some time for your bank or credit card company to process the refund so please allow 3-5 business days. We do not have any control over this.

All goods returned will be fully inspected for damage or wear and tear. In extreme cases we reserve the right to return goods to our suppliers for assessment. In these circumstances up to 30 days may be required for a refund to take place.

If there are any issues or queries please email returns@aivly.com

We reserve the right to limit refunds at our discretion.


Return an item bought in store
If you have bought an item in store and wish to return it you can return it to us in store. Bring your receipt or proof of payment with you and proceed to the till area. If your return is accepted we will then offer you a refund or an exchange. If you decide to exchange, you'll get a new proof of purchase.

Exceptions / non-returnable items

Safety Wear - Non-refundable items include all items of safety wear (including hats, body protectors and air jackets) For this reason they are ONLY sold in store where they can be expertly fitted. Once they have left the store with you their integrity becomes your responsibility.

Bits - Please make sure you select the right bit size for your horse as bits are non-returnable for hygiene reasons.

Animal feed and bedding cannot be returned, unless unopened and the product is still in date.

Underwear - We are unable to accept returns of underwear, and clothing which has been worn.

Hygiene Regulations
Due to the Health and Safety regulations (Health and Safety at Work Act 1974) we are unable to handle or inspect any item of footwear or horse clothing, unless it is clean and dry.

Exchanges
We allow exchanges on items that have been accepted for return both in store and online if a refund is not sufficient.

You can always contact us regarding returns questions at [email protected]

Updated May 2022

Extra Long Lead Rope BLACK single

Season:All Seasons

Brand:Shires

Code:440BLACKONESIZE

Extra Long Lead Rope BLACK single


A useful extra long lead rope with a brass swivel trigger clip. Length: 3m
Sizing Information
Professional Opinion
Product Reviews
Write a review
0 As rated by 0 customers

Write a review for Extra Long Lead Rope BLACK single

Your name
Your email address
How would you rate it?
Would you recommend this product?
Let others know your opinion
Submit Review Close
Question(s) answered about Extra Long Lead Rope BLACK single
Ask a question
Question(s) asked regarding Extra Long Lead Rope BLACK single

Ask a question

Your name
Your email address
Your phone number
Your question
Submit Question  Close
Home Horse Riding Stable & Field Shires Headcollars & Lead Ropes