To improve your shopping experience today and in the future, this site uses cookies.
I Accept Cookies
A useful extra long lead rope with a brass swivel trigger clip.
A useful extra long lead rope with a brass swivel trigger clip.
Arma

Extra Long Lead Rope Orange single

£7.99
Earn
in Customer Rewards when you buy this item today
Pre-Order

With Pre-Order, you can purchase the latest items added to our store in advance of them arriving with us.

Your Pre-Order is prioritised (at no additional charge); meaning that as soon as the product arrives with us, we can wrap it straight back up; ready for collection via Click & Collect or despatch to you — it often never even hits the stock room shelves!

Pre-Launch

With Pre-Launch, the date when we expect to receive the product ourselves is still a little too hazy to be confident in accepting Pre-Orders.

So, instead, you can submit your email address against the item you are interested in and we will email you as soon as stock arrives on the system.

Estimated Delivery & Collection Dates

Estimated Delivery & Collection Dates are given on Pre-Order and Pre-Launch products. They are for indication purposes only and can change at any time without notice.

The dates we provide are based on indications given by our suppliers. Whenever we get updated information from our suppliers we will endeavour to update the Estimated Delivery & Collection Dates provided on product pages.

We estimate this will be ready for despatch to you or collection via Click & Collect on Undetermined
Earn Rewards
When you purchase this item, you will earn of rewards points to spend on your next purchase from us. You can spend your Rewards balance in-store & online.
Hassle free returns.

Extended Christmas Returns
Shop with confidence this Christmas. Orders placed from 30 October 2026 to 8 January 2027 can be returned until 8 January 2027, or within 28 days of receipt, whichever is later.
Orders placed outside this period have our standard 28-day returns period from receipt.

Change of Mind Conditions
If your item is the wrong size, colour, or no longer required, it must be returned unused, unworn and unsoiled, with tags attached and in its original packaging.
A receipt or proof of purchase and your Order Number are required.
Click here for our full returns policy

Items returned with strong odours (e.g., cooking smells, cigarette smoke, perfume) will not qualify for refund, exchange, or store credit.
All returns are inspected by our Returns Department.

Damages and Issues
Inspect your order upon receipt and contact us immediately if it is damaged, defective, or incorrect.
Email photos and details to [email protected] so we can resolve the issue promptly.

Returning for Other Reasons
If your item is the wrong size, colour, or no longer required, you have 28 days from receipt to return it.
Complete the Returns Form included in your parcel and send it with the item to:

Returns Department
Aivly Country Store Ltd
Crow Lane, Ringwood, Hampshire, BH24 3EA

Return postage costs are your responsibility, unless the item is deemed faulty by a member of our staff (in which case we will send out a label).
Refunds are processed to your original payment method within 3–5 business days after inspection. Please note bank processing times may vary.
Refunds are for the item cost only; postage is not reimbursed.

Important Notes
Goods returned are your responsibility until received by us. If you are posting your item(s) back to us, we recommend using a tracked service and obtaining proof of postage.
Refunds are processed Monday–Friday only.
We reserve the right to limit refunds at our discretion.

Exceptions / Non-Returnable Items
Unless faulty, the following cannot be returned or exchanged:

Safety Wear (riding hats, skulls, air jackets, body protectors) - fitted in-store only.
Bits - non-returnable for hygiene reasons.
Animal feed and bedding - unless unopened and in-date.
Items not clean and dry (due to Health & Safety regulations).

Exchanges
Exchanges are allowed for accepted returns both in-store and online.
You are responsible for all shipping costs for exchanges.

Contact
For any queries, email [email protected] or call 01425 472341.

Updated 2025

Extra Long Lead Rope Orange single

Season:All Seasons

Brand:Arma

Code:440ORANGEONESIZE

This 3-meter lead rope provides ample space for training and movement, featuring a durable brass swivel trigger clip for secure handling. Ideal for lunging or everyday use

Sizing Information
Professional Opinion
Product Reviews
Write a review
0 As rated by 0 customers

Write a review for Extra Long Lead Rope Orange single

Your name
Your email address
How would you rate it?
Would you recommend this product?
Let others know your opinion
Submit Review Close
Question(s) answered about Extra Long Lead Rope Orange single
Ask a question
Question(s) asked regarding Extra Long Lead Rope Orange single

Ask a question

Your name
Your email address
Your phone number
Your question
Submit Question  Close
Home Stable & Yard Stable & Field Arma Headcollars & Lead Ropes